Project Name:

Construction of a Warehouse Hall and Office Building for Tuplex, Ruda Śląska

Client:

Tuplex Group – the largest distributor of plastics in Central and Eastern Europe

Project Duration:

10.2023 – 08.2024

Scope of Work:

General contracting including multidisciplinary design and facility handover.

Task:

Construction of a modern warehouse and office facility on a site with challenging ground conditions (remnants of a mine shaft). The project required ensuring high warehouse functionality while maintaining the aesthetic quality of the office building. Environmentally friendly solutions were applied.

Solution:

Development of a detailed construction design considering site-specific conditions and client requirements. Comprehensive project execution from foundations to finishing works.

Applied Solutions and Technologies:

Cantilever racks mounted to reinforced concrete columns; a dedicated foil storage area with mechanical ventilation; hall equipped with a smoke extraction system and fire alarm; office building façade made of Stacbond aluminum composite panels and gres tiles; 50 kWp photovoltaic installation; heating via heat pump.

Key numbers

4900 m²

Warehouse Hall Area

800 m² (2 levels)

Office Building Area

32 m

Span of the Steel Truss Structure for One Warehouse Bay

Construction Log: