We will build a cable production hall.
01.02.2024
As a result of our intensive work earlier this year, we have signed another contract for the redevelopment of a warehouse facility into a production space.
Within the logistics park in Zabrze, the Electro Cable Group will launch the production of power cables, control cables, and data transmission cables.
Our scope of work will include:
- construction of specialized foundations for machinery,
- adaptation of ventilation, heating, and fire protection systems,
- construction of a two-storey office building and technical rooms.
Completion of works is planned for mid-2024. We look forward to the next challenge and thank you for your trust.
Other news

YPERO S.A. Named a Forbes Diamond 2025!
YPERO S.A. has joined the prestigious group of this year’s Forbes Diamonds winners – the fastest-growing companies in Poland. In the medium-sized enterprises category, we ranked 15th in the Greater Poland region and 147th nationwide.

YPERO S.A. Recognized Once Again as a Gazela Biznesu!
YPERO S.A. has been included for the fifth time in the prestigious Gazele Biznesu ranking of the most dynamic small and medium-sized enterprises.