Ground challenges? For us, it's an everyday occurrence—not an obstacle.

11.06.2025

As part of the expansion of a furniture manufacturing plant, we are constructing a two-story industrial hall with high ceiling loads. The project required a specialized foundation approach due to unfavorable ground conditions and significant structural loads. We used indirect foundations based on FDP displacement columns installed beneath the foundation footings. This solution allowed for:

1.

Ensure safe and even transfer of loads to deeper soil layers.

2.

Reduce subsidence.

3.

Minimize interference with the surroundings and the time required for foundation works.

As a general contractor, we are responsible for both the detailed design and the execution of the work. Our engineering team effectively combines experience with modern technologies, ensuring complete security and peace of mind for investors – even in the most complex projects.

Other news

06.03.2026

The investment project for NDL Industrial Sp. z o.o. in Motaniec is entering its next, intensive phase.

Thanks to the efficient coordination of construction teams and ongoing monitoring of key milestones, we carry out earthworks, foundation works, reinforcement works, and the assembly of the building's prefabricated structure.

02.12.2025

Step by step towards the perfect floor!

Creating a durable and solid industrial floor is one of the most important stages of hall construction.