Prestressed reinforced concrete girders – a key element of the warehouse roof structure
17.06.2025
As part of the construction of a warehouse and production hall with office and social facilities in Więckowice, we used prefabricated prestressed girders – a solution that works perfectly in this type of facilities. Why prestressed reinforced concrete girders?
Large spans
They enable the design of space without intermediate supports, which translates into flexibility in the arrangement of the warehouse interior.
High load-bearing capacity with a small cross-section
Prestressing significantly improves the strength parameters of the element.
Quick assembly
Prefabrication and efficient logistics allow for shorter investment implementation times.
Durability and resistance to environmental conditions
Important for industrial facilities.
Other news
The investment project for NDL Industrial Sp. z o.o. in Motaniec is entering its next, intensive phase.
Thanks to the efficient coordination of construction teams and ongoing monitoring of key milestones, we carry out earthworks, foundation works, reinforcement works, and the assembly of the building's prefabricated structure.
Step by step towards the perfect floor!
Creating a durable and solid industrial floor is one of the most important stages of hall construction.